PROPERTY
PERPETUITY
Log inSign up

Landlords · Originally published · Updated · 2 min read

Off-gas-grid heating: check the current heat-pump grant, not an old boiler-ban headline

An old proposal to stop new oil-boiler installations in 2026 should not be presented as current law. Eligible off-gas-grid owners may instead be able to use a temporary £9,000 Boiler Upgrade Scheme grant, subject to detailed conditions.

Property Perpetuity editorial illustration for “Off-gas-grid heating: check the current heat-pump grant, not an old boiler-ban headline”, propertyperpetuity.com
Illustrative artwork · Property Perpetuity

Sign in to save this for later →

Facebook ↗LinkedIn ↗

An archive headline warning of an “impending” oil-boiler ban in 2026 no longer gives owners a reliable basis for planning work. The House of Commons Energy Security and Net Zero Committee’s report on retrofitting homes records that the earlier proposal to phase out oil-boiler installations from 2026 was ruled out in 2023. It should not be recycled as a statement of present law.

For an owner considering a heating replacement now, a more useful starting point is the current Boiler Upgrade Scheme in England and Wales. Ofgem’s property-owner guidance describes a temporary uplift to £9,000 for eligible off-gas-grid properties installing an air-to-water or ground-source heat pump. The published window runs from 21 July 2026 to 31 March 2027.

Eligibility needs a property-level check

The uplift is not a universal rural-home payment. Ofgem’s installer guidance says the property must be off the gas grid and replacing an oil- or LPG-fuelled heating system. Its definition excludes a property with a current gas meter-point record, including capped or clamped connections, as well as heat-network connections and new builds. Self-build properties do not qualify for this particular uplift, although another scheme category may apply.

Government guidance says an owner can be eligible where the property is rented to tenants, as well as where it is their own home. That does not establish that a particular installation meets every technical or administrative requirement. An MCS-certified installer should assess the building and the proposed system before the owner commits.

Compare the complete project

A grant reduces an eligible installation cost; it is not a guarantee that all work will be free or that a household will achieve a particular bill saving. Ask for a written scope covering the heat source, emitters, controls, electrical work, hot-water arrangements and any other changes the assessment identifies.

For a rental property, discuss access and the work programme with occupants. Keep the eligibility assessment, quotation, commissioning information and operating instructions together with the property records. Compare the expected operation of the proposed system with the building’s actual condition rather than relying on a generic fuel-cost claim.

The decision is best approached as a planned building project. Verify the current scheme rules and dates with the installer and Ofgem, and distinguish a funding opportunity from a legal deadline to replace an existing boiler.

Reference source ↗