PROPERTY
PERPETUITY
Log inSign up

Property · Originally published

Future Homes Standard: separating the 2027 start date from the 2028 transition

England’s March 2026 announcement sets different commencement and transition dates, with separate arrangements for higher-risk buildings.

Property Perpetuity editorial illustration for “Future Homes Standard: separating the 2027 start date from the 2028 transition”
Illustrative artwork · Property Perpetuity

Sign in to save this for later →

Facebook ↗LinkedIn ↗

The government published its Future Homes and Buildings Standards package on 24 March 2026, setting out changes to energy performance requirements for buildings in England. The announcement combined new regulations with guidance, rather than imposing an immediate change on every construction project.

The published circular gives 24 March 2027 as the general commencement date. For qualifying non-higher-risk work, transitional protection depends on the relevant notice or full-plans application being submitted before that date and work commencing on the individual building before 24 March 2028. Separate arrangements apply to higher-risk buildings, with specified amendments commencing on 24 September 2027.

This distinction explains why reporting refers to both 2027 and 2028. One date concerns the regulations taking effect; the other is a construction deadline within transitional arrangements. Neither should be presented as a universal date on which every new home automatically changes specification.

In her parliamentary statement, minister Samantha Dixon described the policy as a move towards better building fabric and low-carbon heating, including heat pumps. The stated ambition was for buildings to become zero carbon in use as the electricity supply decarbonises, without further retrofitting. That is a future-facing policy objective, not a claim that every new building already has no emissions.

The package also introduces a requirement for on-site renewable electricity generation for new dwellings and updates information to be supplied to homeowners. Associated guidance covers energy performance and ventilation.

For readers comparing developments, the useful distinction is between the announcement, the applicable building-control requirements and the specification of a particular home. A headline about future standards cannot establish which transitional provisions apply to an individual site.

This archive account records the March 2026 announcement. The government circular and parliamentary statement are the reference points for the dates and policy scope described here.

Reference source ↗