PROPERTY
PERPETUITY
Log inSign up

Landlords · Originally published · Updated · 3 min read

EICR checks in England: what landlords must do and when

A practical guide to electrical installation inspections for private landlords in England: inspection intervals, sharing reports with tenants, remedial work and record keeping.

Property Perpetuity editorial illustration for “EICR checks in England: what landlords must do and when” — propertyperpetuity.com
Illustrative artwork · Property Perpetuity

Sign in to save this for later →

Facebook ↗LinkedIn ↗

Private landlords in England must keep fixed electrical installations in rented homes safe. The Electrical Safety Standards in the Private Rented Sector Regulations require inspection and testing by a qualified person at least every five years, or sooner if the current report specifies a shorter interval. This is a check of the fixed installation, including wiring, sockets, light fittings and the consumer unit. It is not a substitute for maintaining the property or dealing with an electrical fault as soon as it is reported.

The inspector will normally provide an Electrical Installation Condition Report, often called an EICR. Read the report rather than filing it unread: note the inspection date, next inspection date, observations and whether further investigation or remedial work is required. Keep the full report and give the inspector a copy of relevant previous findings before the next test. Do not treat a report as a blanket guarantee that every appliance in the home is safe.

There are deadlines for providing the document. Give an existing tenant a copy within 28 days of the inspection. A new tenant must receive the most recent report before occupying the property. A prospective tenant who asks in writing must receive a copy within 28 days. If the local council requests the report in writing, the landlord must provide it within seven days. Keep a dated record of how and when each copy was supplied.

If the report says that investigative or remedial work is needed, arrange it with a qualified person within 28 days, or within any shorter period stated in the report. After the work, obtain written confirmation of the outcome and provide the required records to the tenant and, where applicable, the council. If the defect is urgent, follow the report’s instructions promptly and ensure the affected installation is made safe.

A useful property file should include the latest report, invoices and completion certificates for remedial work, tenant delivery records, and a reminder for the next inspection. When a tenancy changes, check whether a valid report is still in date and make sure the incoming tenant receives it before occupation; a new test is not automatically required at every change if the existing report remains valid and no further work is outstanding.

This guide is about private rented homes in England. Requirements differ across the UK, and individual reports may set shorter timescales. Consult the current regulations and a qualified electrician for property-specific decisions.

Official guidance: https://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance

Reference source ↗